Cases
From approved plan to resolved outcome
Every case starts from a person approving an AI plan. All current cases come from simulated scenarios.
Open
1
In Progress
0
Resolved
9
This simulated substation cybersecurity scenario could cascade into electricity, water, communications, healthcare, education, and farming disruptions. Demo estimates indicate 545 people and 23 infrastructure systems potentially affected. Nothing has actually been detected; critical urgency applies only to drill planning.
- Have utility operators verify substation status and rehearse approved operational-technology isolation. Network administrators should isolate any verified suspect router or segment, preserve power and evidence where safe, and provide backup connectivity. Do not disconnect utility equipment independently. (Utility operations lead and network administrator)
- Inventory connected devices and review activity logs, administrative access, and recent configuration changes. Record timestamps and preserve evidence before resets. Compare observations with known baselines; treat demo posture labels as unverified. (Network administrator and authorized utility security team)
- Check water operations and approved backup power with service operators. Prioritize clinic and emergency connectivity; rehearse telephone appointment fallback where available. Have farm operators verify autonomous irrigation and safely test manual override. (Water operator, clinic coordinator, and farm operations lead)
- After evidence capture and authorized assessment, restore trusted configurations and test reconnection in stages. Check firmware against vendor releases, update supported devices, and replace Orchard Router because its firmware is unsupported. Verify essential services after each change. (Network administrator and equipment vendors)
- Issue clearly labeled drill updates through online and offline channels. Share clinic fallback contact arrangements, service-check priorities, and the next update time. Explain that report counts and impact estimates do not establish a real incident. (Community response coordinator and service communications leads)
- Replace default and shared credentials with unique administrative accounts, enable MFA wherever supported, and disable internet-facing remote administration. Restrict management access and separate farm and IoT devices from guest networks. (Network administrator and farm equipment administrators)
- Schedule firmware and laptop updates, recurring connected-device reviews, and backup-restoration exercises. Assess sensor encryption, restrict camera footage access and retention, and document approved data handling without distributing identifiable recordings. (IT maintenance lead and organizational data stewards)
Shared with: Electric utility operations and security teams, Water utility operators, Telecommunications provider and community network administrators, Clinic leadership and emergency management, School and library administrators, Farm operations leads and Orchard Cooperative management
Activity log
- Understanding the incident 3:29:54 AM
Cybersecurity incident at Substation (simulated).
- Identifying affected systems 3:29:55 AM
23 systems across 8 areas: Village Center, South, Central East, North, South East, Central West, South West, North West.
- Analyzing dependencies 3:29:56 AM
Substation → Cell Tower → Village Mesh Router → Orchard Router → Orchard Cooperative · Substation → Cell Tower → Village Mesh Router → Smart Irrigation Controller → Grain Fields · Substation → Cell Tower → Village Mesh Router → Farm Network → Soil Moisture Sensors
- Finding related community reports 3:29:57 AM
13 related reports and 1 note on affected places (only counts are passed on).
- Retrieving trusted resources 3:29:58 AM
Matched tags [cyber, privacy, power, water, internet, community, agriculture, home, router, camera, irrigation, network, sensor, equipment, laptop] → 6 sources (5 official).
- Checking cybersecurity implications 3:29:58 AM
12 connected digital systems in the chain (Internet, Routers, Cameras, Smart irrigation, Networks, Sensors, Farm equipment, Laptops). Treated as simulated risk, not confirmed compromise.
- Determining possible impact 3:29:59 AM
~545 people (demo estimate), 12 services, urgency critical.
- Creating the response plan 3:30:39 AM
7 steps (6 high priority), citing 3 sources.
- Explaining the reasoning 3:30:40 AM
The supplied chains identify Substation, Cell Tower, and Village Mesh Router as shared upstream dependencies, making safe verification and essential-service continuity priorities. Simulated device weaknesses guide targeted hardening, while demo counts and community reports justify checks rather than conclusions about compromise.
- Preparing the report 3:30:41 AM
Data sharing preview built: 22 systems, counts only, no resident text.
- Asking for your approval 3:30:41 AM
Waiting for a person to review the plan and data sharing preview.
- Approved 4:17:53 AM
User approved the plan and data sharing preview.
- Case created 4:17:54 AM
Approved by user; tracking started.